Assessed, fabricated and delivered by us — installed by a Herholdt's Group Premium Partner.
Industrialec builds what the group installs — boards, panels and containerised battery systems, out of one Bloemfontein workshop. The same team designs it, builds it and stays accountable after handover.
| Unit | Size | External dims |
|---|---|---|
| CES-10 | 10ft | 2 991 × 2 438 × 2 591 mm |
| CES-20 | 20ft | 6 058 × 2 438 × 2 591 mm |
| CES-40 | 40ft | 12 192 × 2 438 × 2 591 mm |
Engineered per project.
On-site delivery
Finished DB bank
CES-20
Laser-cut
Press brake
Powder coat
Insulated lining
CES-10, mid-build
Fire detection, standard
Containerised battery storage delivered as energy-as-a-service for a Nashua branch site.

Containerised battery storage with a custom grid/generator/load panel — production and cold storage keep running through outages.

Fabricated off-site and craned into place in a single visit — uninterrupted power for clinical equipment.

40ft ISO shells fabricated to stock, ready to deploy as manufacturing demand scales.
Representative projects from our customer base, named with permission.
The terms that govern quotations, scope, payment, delivery and warranty.
Read the full policy (PDF) →What personal information we collect, how we use it and how to access, correct or delete it.
Read the full policy (PDF) →How we treat the site, load and project information you share with us.
Read the full policy (PDF) →